Starting Out
A weird aspect about our new 2003 Mid-Hudson Valley home: the builders never completed the HVAC System installation!
While there was duct work in place in the walls and ceilings, the condenser unit and heat pump were never installed. We relied on oil to heat the house all Winter and there was no A/C during the Summer, just ceiling fans in each room. While we could tolerate temperatures in the 80’s with the ceiling fans, once temperatures reached the 90’s, it became unbearable. We knew we needed to improve the climate in our home with a new HVAC system.


What you need to know about HVAC systems
An HVAC system works to remove humidity in your home when you want cooler temps and pumps warm air in when you want warmer temps. HVAC systems are either Ducted or Ductless and there are 4 areas to consider when determining what’s right for your home: capacity (tons), efficiency (sheer), noise (buzzing) and reliability (does it get the job done?). Here is a link with more helpful info.
Our house is 1900 Sq. Ft. Usually the air handler is located in your attic or basement. Our air handler is located in a second floor closet space!
We spent more than a month shopping around for companies to review the project and provide estimates and decided on a local company DS Home Services to complete the installation.



We settled on a 3.5 ton, 15 Sheer Bosch 1 stage air handler and heat pump condenser, which is sufficient until temps reach below 30 degrees.
The new HVAC made such a difference
We noticed the difference immediately and, so far, our heating and cooling costs have decreased. Because we’re on a single zone system, we’ve kept the air vents on the second floor closed so the air flows downstairs first. There’s still about a 5 degree temperature difference between the two floors, but we’re comfortable. We’re so happy we could improve the climate in our home with the new HVAC system!
Materials & Cost$:
Bosch 15 seer heat pump system (labor included)-$10,500.00
Recent Posts
How To Add New Crown Molding For An Elevated Finish
When we first walked through our new home, the only room that had crown molding installed was the living room….
New DIY Home Office Makeover: The Reveal (Pt.4)
I first started our home office makeover in April and it’s time for the reveal! Similar to our experience with our new walk-in…
New DIY Home Office Make Over: Refinishing Heirloom Desks (Pt.3)
As part of our home office remodel, we have two mid-century desks that need refinishing. Both are family heirlooms from my father. Refinishing:…
New DIY Home Office Makeover: Custom Bookcase Build (Pt.2)
I’m in the process of remodeling our home office and the first stage of the makeover is installing new custom…
New DIY Home Office Makeover: Budget-Friendly Storage (Pt.1)
Starting out When you walk into our 2003 house, the first thing you look at, aside from the staircase, is our office…
How To Go Green With Greenworks: Lawn Care Made Easy
Spring is here! Are you thinking of replacing your lawn and outdoor home maintenance equipment? Consider Greenworks electric power tools…


Leave a Reply